What a 5 kWp system means
At this location's modelled yield, a 5 kWp first-year array would produce about 5,204 kWh. Your usable savings depend on when you consume electricity, not just this total.
Live city solar profile
Each kilowatt of south-facing panels at 30° in Berlin generates about 1,041 kWh per year, ranging from 26 kWh in Dec to 135 kWh in Jun.
Annual yield
1,041 kWh/kWp
Best month
Jun · 135 kWh
Year-to-year variation
±59 kWh
Reference payback*
9.8 years
The strongest month produces 5.3× the weakest month.
Jan29.9 kWh
Feb52.4 kWh
Mar88 kWh
Apr120.5 kWh
May133.2 kWh
Jun134.7 kWh
Jul130.8 kWh
Aug121.1 kWh
Sep101.2 kWh
Oct67.5 kWh
Nov36.1 kWh
Dec25.5 kWh
Source: EU JRC PVGIS 5.3 , PVGIS-SARAH3 (2005–2023), 52.5200, 13.4050, 37 m elevation. Retrieved 2026-11-17. *Reference payback uses illustrative defaults (5 kWp, €1,300/kWp, €0.25/kWh) — not a local market price.
At this location's modelled yield, a 5 kWp first-year array would produce about 5,204 kWh. Your usable savings depend on when you consume electricity, not just this total.
This profile is 0.6% below the average of the 3 Germany cities currently in this directory. That is a comparison of modelled city-centre points, not roof suitability.
Output peaks in Jun and bottoms in Dec. A high annual total can still leave winter imports; batteries and tariffs need an hourly assessment.
Replace every illustrative assumption with your own quote and bill. Adjust roof settings under Advanced.
Berlin, Germany1,041 kWh/kWp
Use the complete figure from your quote.
Enter only support you have verified.
Sum the last 12 months on your bills.
The unit charges you avoid by using less grid electricity.
An annual assumption, not a battery dispatch simulation.
Estimated simple payback
9.8years
Upfront cost
€6,500
Year-1 savings
€708
25-yr net gain
€10,495
Return (IRR)
8.8%
Year-1 production
5,204 kWh
Bill covered by solar
46%
Discounted cost / solar kWh
€0.112
PVGIS PVGIS-SARAH3 (2005–2023), 30° tilt, 0° aspect, 14% losses. 0.5%/yr degradation, €15/kWp/yr maintenance. Retrieved 2026-11-17.
| Year | Generation | Savings | Costs | Cumulative |
|---|---|---|---|---|
| 1 | 5,204 kWh | €708 | €75 | -€5,867 |
| 2 | 5,178 kWh | €716 | €77 | -€5,227 |
| 3 | 5,152 kWh | €725 | €78 | -€4,580 |
| 4 | 5,126 kWh | €734 | €80 | -€3,926 |
| 5 | 5,101 kWh | €743 | €81 | -€3,264 |
| 6 | 5,075 kWh | €752 | €83 | -€2,594 |
| 7 | 5,050 kWh | €762 | €84 | -€1,917 |
| 8 | 5,025 kWh | €771 | €86 | -€1,232 |
| 9 | 4,999 kWh | €781 | €88 | -€539 |
| 10 | 4,974 kWh | €790 | €90 | €162 |
| 11 | 4,950 kWh | €800 | €91 | €870 |
| 12 | 4,925 kWh | €810 | €1,293 | €387 |
| 13 | 4,900 kWh | €820 | €95 | €1,112 |
| 14 | 4,876 kWh | €830 | €97 | €1,846 |
| 15 | 4,851 kWh | €841 | €99 | €2,588 |
| 16 | 4,827 kWh | €851 | €101 | €3,338 |
| 17 | 4,803 kWh | €862 | €103 | €4,097 |
| 18 | 4,779 kWh | €873 | €105 | €4,865 |
| 19 | 4,755 kWh | €884 | €107 | €5,642 |
| 20 | 4,731 kWh | €895 | €109 | €6,428 |
| 21 | 4,708 kWh | €906 | €111 | €7,223 |
| 22 | 4,684 kWh | €918 | €114 | €8,027 |
| 23 | 4,661 kWh | €929 | €116 | €8,840 |
| 24 | 4,637 kWh | €941 | €118 | €9,663 |
| 25 | 4,614 kWh | €953 | €121 | €10,495 |
If every other assumption stayed the same:
Installed cost -15% → 8.4 years
Installed cost +15% → 12.8 years
Independent quote audit
Enter what the installer promised. We test each claim against PVGIS satellite data for this exact roof and stress-test the economics. The figures above (cost, tariff, self-use) are treated as the quote.
Audit score 53/100
Significant screening issues: renegotiate or obtain alternative quotes.
PVGIS year-1 output
5,204 kWh
Claim vs PVGIS
—
Independent payback
9.8 yrs
Break-even price
€2,072/kWp
No annual generation figure stated
A quote without a written generation estimate cannot be verified. Request one with the method used.
Return turns negative under combined stress
The project only works if yield, prices and self-use all hold. Build in a margin of safety.
6 critical contract protections missing
Itemised quote (panels, inverter, mounting, labour, electrical); Panel product and performance warranty stated (brand, model, years, % output); Inverter model and warranty term stated; Installer workmanship / roof-penetration warranty; Grid / network connection paperwork and meter changes included; Staged payment — balance due only after commissioning.
Full Quote Audit Dossier (PDF)
Graded verdict, generation forensics with monthly chart, six downside scenarios, battery due diligence, 25-year ledger, contract checklist and a tailored list of questions to send your installer.