What a 5 kWp system means
At this location's modelled yield, a 5 kWp first-year array would produce about 5,210 kWh. Your usable savings depend on when you consume electricity, not just this total.
Live city solar profile
Each kilowatt of south-facing panels at 30° in Warsaw generates about 1,042 kWh per year, ranging from 24 kWh in Dec to 137 kWh in Jun.
Annual yield
1,042 kWh/kWp
Best month
Jun · 137 kWh
Year-to-year variation
±48 kWh
Reference payback*
9.8 years
The strongest month produces 5.8× the weakest month.
Jan31.2 kWh
Feb47.9 kWh
Mar87.4 kWh
Apr118.6 kWh
May132.3 kWh
Jun137.3 kWh
Jul134.8 kWh
Aug126.3 kWh
Sep102.1 kWh
Oct68.9 kWh
Nov31.6 kWh
Dec23.6 kWh
Source: EU JRC PVGIS 5.3 , PVGIS-SARAH3 (2005–2023), 52.2297, 21.0122, 117 m elevation. Retrieved 2026-11-17. *Reference payback uses illustrative defaults (5 kWp, 1300 zł/kWp, 0,25 zł/kWh) — not a local market price.
At this location's modelled yield, a 5 kWp first-year array would produce about 5,210 kWh. Your usable savings depend on when you consume electricity, not just this total.
This profile is 0% above the average of the 1 Poland city currently in this directory. That is a comparison of modelled city-centre points, not roof suitability.
Output peaks in Jun and bottoms in Dec. A high annual total can still leave winter imports; batteries and tariffs need an hourly assessment.
Replace every illustrative assumption with your own quote and bill. Adjust roof settings under Advanced.
Warsaw, Poland1,042 kWh/kWp
Use the complete figure from your quote.
Enter only support you have verified.
Sum the last 12 months on your bills.
The unit charges you avoid by using less grid electricity.
An annual assumption, not a battery dispatch simulation.
Estimated simple payback
9.8years
Upfront cost
6500 zł
Year-1 savings
709 zł
25-yr net gain
10 519 zł
Return (IRR)
8.8%
Year-1 production
5,210 kWh
Bill covered by solar
46%
Discounted cost / solar kWh
0,112 zł
PVGIS PVGIS-SARAH3 (2005–2023), 30° tilt, 0° aspect, 14% losses. 0.5%/yr degradation, 15 zł/kWp/yr maintenance. Retrieved 2026-11-17.
| Year | Generation | Savings | Costs | Cumulative |
|---|---|---|---|---|
| 1 | 5,210 kWh | 709 zł | 75 zł | -5866 zł |
| 2 | 5,184 kWh | 717 zł | 77 zł | -5226 zł |
| 3 | 5,158 kWh | 726 zł | 78 zł | -4578 zł |
| 4 | 5,132 kWh | 735 zł | 80 zł | -3922 zł |
| 5 | 5,106 kWh | 744 zł | 81 zł | -3259 zł |
| 6 | 5,081 kWh | 753 zł | 83 zł | -2589 zł |
| 7 | 5,055 kWh | 763 zł | 84 zł | -1911 zł |
| 8 | 5,030 kWh | 772 zł | 86 zł | -1225 zł |
| 9 | 5,005 kWh | 782 zł | 88 zł | -532 zł |
| 10 | 4,980 kWh | 791 zł | 90 zł | 170 zł |
| 11 | 4,955 kWh | 801 zł | 91 zł | 880 zł |
| 12 | 4,930 kWh | 811 zł | 1293 zł | 398 zł |
| 13 | 4,906 kWh | 821 zł | 95 zł | 1124 zł |
| 14 | 4,881 kWh | 831 zł | 97 zł | 1858 zł |
| 15 | 4,857 kWh | 842 zł | 99 zł | 2601 zł |
| 16 | 4,832 kWh | 852 zł | 101 zł | 3352 zł |
| 17 | 4,808 kWh | 863 zł | 103 zł | 4112 zł |
| 18 | 4,784 kWh | 874 zł | 105 zł | 4881 zł |
| 19 | 4,760 kWh | 885 zł | 107 zł | 5659 zł |
| 20 | 4,737 kWh | 896 zł | 109 zł | 6446 zł |
| 21 | 4,713 kWh | 907 zł | 111 zł | 7242 zł |
| 22 | 4,689 kWh | 919 zł | 114 zł | 8047 zł |
| 23 | 4,666 kWh | 930 zł | 116 zł | 8861 zł |
| 24 | 4,643 kWh | 942 zł | 118 zł | 9685 zł |
| 25 | 4,619 kWh | 954 zł | 121 zł | 10 519 zł |
If every other assumption stayed the same:
Installed cost -15% → 8.4 years
Installed cost +15% → 12.8 years
Independent quote audit
Enter what the installer promised. We test each claim against PVGIS satellite data for this exact roof and stress-test the economics. The figures above (cost, tariff, self-use) are treated as the quote.
Audit score 53/100
Significant screening issues: renegotiate or obtain alternative quotes.
PVGIS year-1 output
5,210 kWh
Claim vs PVGIS
—
Independent payback
9.8 yrs
Break-even price
2075 zł/kWp
No annual generation figure stated
A quote without a written generation estimate cannot be verified. Request one with the method used.
Return turns negative under combined stress
The project only works if yield, prices and self-use all hold. Build in a margin of safety.
6 critical contract protections missing
Itemised quote (panels, inverter, mounting, labour, electrical); Panel product and performance warranty stated (brand, model, years, % output); Inverter model and warranty term stated; Installer workmanship / roof-penetration warranty; Grid / network connection paperwork and meter changes included; Staged payment — balance due only after commissioning.
Full Quote Audit Dossier (PDF)
Graded verdict, generation forensics with monthly chart, six downside scenarios, battery due diligence, 25-year ledger, contract checklist and a tailored list of questions to send your installer.