What a 5 kWp system means
At this location's modelled yield, a 5 kWp first-year array would produce about 5,831 kWh. Your usable savings depend on when you consume electricity, not just this total.
Live city solar profile
Each kilowatt of south-facing panels at 30° in Vienna generates about 1,166 kWh per year, ranging from 40 kWh in Dec to 142 kWh in Jul.
Annual yield
1,166 kWh/kWp
Best month
Jul · 142 kWh
Year-to-year variation
±43 kWh
Reference payback*
8.7 years
The strongest month produces 3.6× the weakest month.
Jan45.5 kWh
Feb66.6 kWh
Mar103.9 kWh
Apr128.8 kWh
May133.2 kWh
Jun137.7 kWh
Jul142.3 kWh
Aug130.8 kWh
Sep111.2 kWh
Oct80.4 kWh
Nov46.2 kWh
Dec39.6 kWh
Source: EU JRC PVGIS 5.3 , PVGIS-SARAH3 (2005–2023), 48.2082, 16.3738, 186 m elevation. Retrieved 2026-11-17. *Reference payback uses illustrative defaults (5 kWp, €1,300/kWp, €0.25/kWh) — not a local market price.
At this location's modelled yield, a 5 kWp first-year array would produce about 5,831 kWh. Your usable savings depend on when you consume electricity, not just this total.
This profile is 0% above the average of the 1 Austria city currently in this directory. That is a comparison of modelled city-centre points, not roof suitability.
Output peaks in Jul and bottoms in Dec. A high annual total can still leave winter imports; batteries and tariffs need an hourly assessment.
Replace every illustrative assumption with your own quote and bill. Adjust roof settings under Advanced.
Vienna, Austria1,166 kWh/kWp
Use the complete figure from your quote.
Enter only support you have verified.
Sum the last 12 months on your bills.
The unit charges you avoid by using less grid electricity.
An annual assumption, not a battery dispatch simulation.
Estimated simple payback
8.7years
Upfront cost
€6,500
Year-1 savings
€793
25-yr net gain
€12,979
Return (IRR)
10.5%
Year-1 production
5,831 kWh
Bill covered by solar
52%
Discounted cost / solar kWh
€0.10
PVGIS PVGIS-SARAH3 (2005–2023), 30° tilt, 0° aspect, 14% losses. 0.5%/yr degradation, €15/kWp/yr maintenance. Retrieved 2026-11-17.
| Year | Generation | Savings | Costs | Cumulative |
|---|---|---|---|---|
| 1 | 5,831 kWh | €793 | €75 | -€5,782 |
| 2 | 5,802 kWh | €803 | €77 | -€5,056 |
| 3 | 5,773 kWh | €813 | €78 | -€4,321 |
| 4 | 5,744 kWh | €823 | €80 | -€3,578 |
| 5 | 5,716 kWh | €833 | €81 | -€2,826 |
| 6 | 5,687 kWh | €843 | €83 | -€2,066 |
| 7 | 5,659 kWh | €853 | €84 | -€1,297 |
| 8 | 5,630 kWh | €864 | €86 | -€519 |
| 9 | 5,602 kWh | €875 | €88 | €268 |
| 10 | 5,574 kWh | €886 | €90 | €1,064 |
| 11 | 5,546 kWh | €897 | €91 | €1,869 |
| 12 | 5,519 kWh | €908 | €1,293 | €1,484 |
| 13 | 5,491 kWh | €919 | €95 | €2,308 |
| 14 | 5,464 kWh | €931 | €97 | €3,141 |
| 15 | 5,436 kWh | €942 | €99 | €3,984 |
| 16 | 5,409 kWh | €954 | €101 | €4,838 |
| 17 | 5,382 kWh | €966 | €103 | €5,701 |
| 18 | 5,355 kWh | €978 | €105 | €6,574 |
| 19 | 5,328 kWh | €990 | €107 | €7,457 |
| 20 | 5,302 kWh | €1,003 | €109 | €8,351 |
| 21 | 5,275 kWh | €1,016 | €111 | €9,255 |
| 22 | 5,249 kWh | €1,028 | €114 | €10,170 |
| 23 | 5,223 kWh | €1,041 | €116 | €11,095 |
| 24 | 5,196 kWh | €1,055 | €118 | €12,031 |
| 25 | 5,170 kWh | €1,068 | €121 | €12,979 |
If every other assumption stayed the same:
Installed cost -15% → 7.4 years
Installed cost +15% → 9.9 years
Independent quote audit
Enter what the installer promised. We test each claim against PVGIS satellite data for this exact roof and stress-test the economics. The figures above (cost, tariff, self-use) are treated as the quote.
Audit score 53/100
Significant screening issues: renegotiate or obtain alternative quotes.
PVGIS year-1 output
5,831 kWh
Claim vs PVGIS
—
Independent payback
8.7 yrs
Break-even price
€2,375/kWp
No annual generation figure stated
A quote without a written generation estimate cannot be verified. Request one with the method used.
Return turns negative under combined stress
The project only works if yield, prices and self-use all hold. Build in a margin of safety.
6 critical contract protections missing
Itemised quote (panels, inverter, mounting, labour, electrical); Panel product and performance warranty stated (brand, model, years, % output); Inverter model and warranty term stated; Installer workmanship / roof-penetration warranty; Grid / network connection paperwork and meter changes included; Staged payment — balance due only after commissioning.
Full Quote Audit Dossier (PDF)
Graded verdict, generation forensics with monthly chart, six downside scenarios, battery due diligence, 25-year ledger, contract checklist and a tailored list of questions to send your installer.