Live city solar profile

Solar panels in Vienna

Each kilowatt of south-facing panels at 30° in Vienna generates about 1,166 kWh per year, ranging from 40 kWh in Dec to 142 kWh in Jul.

Annual yield

1,166 kWh/kWp

Best month

Jul · 142 kWh

Year-to-year variation

±43 kWh

Reference payback*

8.7 years

Monthly production per kWp

The strongest month produces 3.6× the weakest month.

Compare cities
View monthly data table

Jan45.5 kWh

Feb66.6 kWh

Mar103.9 kWh

Apr128.8 kWh

May133.2 kWh

Jun137.7 kWh

Jul142.3 kWh

Aug130.8 kWh

Sep111.2 kWh

Oct80.4 kWh

Nov46.2 kWh

Dec39.6 kWh

Source: EU JRC PVGIS 5.3 , PVGIS-SARAH3 (2005–2023), 48.2082, 16.3738, 186 m elevation. Retrieved 2026-11-17. *Reference payback uses illustrative defaults (5 kWp, €1,300/kWp, €0.25/kWh) — not a local market price.

What a 5 kWp system means

At this location's modelled yield, a 5 kWp first-year array would produce about 5,831 kWh. Your usable savings depend on when you consume electricity, not just this total.

Versus Austria

This profile is 0% above the average of the 1 Austria city currently in this directory. That is a comparison of modelled city-centre points, not roof suitability.

Seasonality matters

Output peaks in Jul and bottoms in Dec. A high annual total can still leave winter imports; batteries and tariffs need an hourly assessment.

Estimate your own payback in Vienna

Replace every illustrative assumption with your own quote and bill. Adjust roof settings under Advanced.

Vienna, Austria1,166 kWh/kWp

Your quote & bill

5 kWp
€1,300/kWp

Use the complete figure from your quote.

€0

Enter only support you have verified.

4,500 kWh

Sum the last 12 months on your bills.

€0.25/kWh

The unit charges you avoid by using less grid electricity.

€0.06/kWh
40%

An annual assumption, not a battery dispatch simulation.

2%

Estimated simple payback

8.7years

Upfront cost

€6,500

Year-1 savings

€793

25-yr net gain

€12,979

Return (IRR)

10.5%

Compare saved

Year-1 production

5,831 kWh

Bill covered by solar

52%

Discounted cost / solar kWh

€0.10

Cumulative cash position

NPV @4%: €5,375

PVGIS PVGIS-SARAH3 (2005–2023), 30° tilt, 0° aspect, 14% losses. 0.5%/yr degradation, €15/kWp/yr maintenance. Retrieved 2026-11-17.

View annual cash-flow table
YearGenerationSavingsCostsCumulative
15,831 kWh€793€75-€5,782
25,802 kWh€803€77-€5,056
35,773 kWh€813€78-€4,321
45,744 kWh€823€80-€3,578
55,716 kWh€833€81-€2,826
65,687 kWh€843€83-€2,066
75,659 kWh€853€84-€1,297
85,630 kWh€864€86-€519
95,602 kWh€875€88€268
105,574 kWh€886€90€1,064
115,546 kWh€897€91€1,869
125,519 kWh€908€1,293€1,484
135,491 kWh€919€95€2,308
145,464 kWh€931€97€3,141
155,436 kWh€942€99€3,984
165,409 kWh€954€101€4,838
175,382 kWh€966€103€5,701
185,355 kWh€978€105€6,574
195,328 kWh€990€107€7,457
205,302 kWh€1,003€109€8,351
215,275 kWh€1,016€111€9,255
225,249 kWh€1,028€114€10,170
235,223 kWh€1,041€116€11,095
245,196 kWh€1,055€118€12,031
255,170 kWh€1,068€121€12,979

Quote sensitivity

If every other assumption stayed the same:

Installed cost -15% → 7.4 years

Installed cost +15% → 9.9 years

Independent quote audit

Is your installer's quote telling the truth?

Enter what the installer promised. We test each claim against PVGIS satellite data for this exact roof and stress-test the economics. The figures above (cost, tariff, self-use) are treated as the quote.

Installer's claims (0 = not stated)
Battery in the quote? (0 = none)
What does the quote/contract include?
D

Audit score 53/100

Significant screening issues: renegotiate or obtain alternative quotes.

PVGIS year-1 output

5,831 kWh

Claim vs PVGIS

—

Independent payback

8.7 yrs

Break-even price

€2,375/kWp

  • No annual generation figure stated

    A quote without a written generation estimate cannot be verified. Request one with the method used.

  • Return turns negative under combined stress

    The project only works if yield, prices and self-use all hold. Build in a margin of safety.

  • 6 critical contract protections missing

    Itemised quote (panels, inverter, mounting, labour, electrical); Panel product and performance warranty stated (brand, model, years, % output); Inverter model and warranty term stated; Installer workmanship / roof-penetration warranty; Grid / network connection paperwork and meter changes included; Staged payment — balance due only after commissioning.

Full Quote Audit Dossier (PDF)

Graded verdict, generation forensics with monthly chart, six downside scenarios, battery due diligence, 25-year ledger, contract checklist and a tailored list of questions to send your installer.

Nearby solar profiles